Friday, June 26, 2009

June 25, 2009 Although we didn't get a picture of it Jennifer went to the Lumberport Shinnston Gas Co. office in Lumberport to sign up for gas. Of course she had to pay a deposit and Mark will have to do some kind of air test before they will set the meter but she is now officially signed up.
June 26, 2009 Above is Jennifer's first feathery visitor. He/she was sitting in the side yard.
Reinforcing the railing on the front of the house, just in case.
This is the inside of the linen closet.

The kitchen sink is installed and Jennifer can wash dishes.






June 26, 2009 The tub has arrived and looks like it is supposed to. The other picture is of her sink in the master bathroom.


June 24, 2009 Some shots of the house and driveway in the early morning.
Jennifer had to write in the wet cement to leave her mark. She had done that earlier but the rain washed it away - awwwwwwwwwwwwwwwww.











June 22, 2009 Bob and some of the cabinet workers on the back porch. Also a picture of the driveway from the back porch and the dust to dawn light on the back of the house.


June 22, 2009 Counter tops in the kitchen, the hotwater tank and the bathroom.











June 22, 2009 Lots of stuff happening at the house today. This is a view of the master bedroom closet and patio doors and the commode and counter for the sink in the master bath.
June 22, 2009 After the house and porches were powerwashed. The porches and driveways also got some kind of sealant on them.





Top soil to help the grass grow, yeahhhhhhh!



June 19, 2009 Samuel is doing an inspection in the living room. above is the kitchen before the sink and appliances.


Thursday, June 18, 2009


June 17, 2009 They were putting the flooring down in the kitchen, hallway and the two bedrooms, it really looks nice.



Below is Jennifer sitting in her livingroom area looking at the great work on the floor in the kitchen.







June 15, 2009 Views of the house as it is today.
June 8, 2009 Jennifer autographing the end of the driveway. That very evening the rain washed it away, after all that work.
This is a view of the driveway and where the outbuilding will be.








Saturday, June 6, 2009

June 6, 2009 All of the walls are painted eggshell and it will go with everything. After I have lived there for a while I can decide on other colors if I want to change them.
This is a picture of my bedroom with some stuff stored in it, that is not my bed :-))
This is a picture of the spare bedroom that faces Stewart Street.

I guess that you can assume that this is the hallway facing the bedroom section.

The livingroom. It looks much bigger since it is painted - who would have thought that??

This is a picture of the kitchen.




June 6, 2009 They delivered the kitchen cabinets and they are setting on the front porch waiting to be installed. They also poured the concrete in the first section of driveway right by the back porch.




June 5, 2009 the electric was run to the house, now there is light, well almost. The electrician will be at the house on the evening of the 6th to put in the outlets and wall switches and then comes the lights, fans, etc. It is getting real here, can you believe it???








June 4, 2009 The side walk/ramp is done and they poured the floor for the out building.



On June 2, 2009 I went to the City of Shinnston to sign up for water service. I had to pay a deposit (yuck) and fill out this form. Oh well, I guess I need water.